HomeProjectLocationServicesPossibilitiesRoadmapContact
Construction
Development Roadmap

Phased
Construction.

From startup configuration to a full 240 ha industrial estate — Dordt. is built for the long term.

Phased Development

Start-up to
full scale — by design.

Dordt. is designed for phased construction — operational from the very first stage, and scalable to meet growing demand.

In the start-up phase, the public road is in use, with a 200m x 60m quay accommodating 2 supply vessels simultaneously. Each subsequent phase expands the quay, the yard, and the full service offering.

I
Now → Q3 2026
Start-Up Phase — First Operations
  • 200m x 60m quay — 2 supply vessels simultaneously
  • Liquid Mud Plant adjacent to quay
  • Open storage and initial warehouse facilities
  • Office facilities and parking
  • Fuel and water storage
  • Public road access in use
II
Phase II Expansion
Full Quay — 550m Operations
  • Full 550m quay — 5 supply vessels simultaneously
  • Complete warehouse and climate storage facilities
  • Workshops, wash bays, and maintenance areas
  • Fuel terminal — storage and distribution
  • New internal road network commissioned
  • Medical center and expanded offices
III
Full Development
240 ha Yard — Complete Estate
  • Full 240 ha yard development realized
  • Water production and treatment plant
  • Waste management facility
  • Full power, water and fuels infrastructure
  • Commewijne regional spatial planning integration
  • Connection to Paranam, Rac-A-Rac industrial network
Key Specifications
Operations StartQ3 2026 ●
Start-Up Quay200m × 60m · 2 vessels
Full Quay550m · 5 vessels
Water DepthMin. 8.5m at low tide
Bearing Capacity20 MT/m²
Max Load150 metric ton loads
Yard (full)Up to 240 ha
Waterfront700m total
Discuss Your Needs →